athlete's village, london

>

  • PROJECT DETAILS   

     

    The Athletes Village is a Lendlease Developments Ltd. project for the 2012 Olympic Games. It includes the Design and Construction of Rail Infrastructure, Roads, Utilities, 2,700 new homes of various sizes and tenures, public realm, landscaping, all-age Academy School, a hotel, retail units, and ancillary works.

    The Elliott Group were appointed as preferred bidder in November 2009 for the Design & Build of Plot N14 — Athletes’ accommodation. The scheme comprises 201 residential units accom- modating 1,500 athletes during the games. This scheme will be re-configured post-2012 (to ‘legacy mode’) and the Athletes Village will form part of a wider regeneration of the area. The units will be a mix of market, intermediate, and social tenures. Plot N14 consists of four blocks in a U-shape around a central courtyard, ranging from 8 to 11 storeys, with parking for 99 cars, 20 motorbikes, and 201 bicycles. Construction is re-inforced concrete frame with pre- cast facades and recessed glazing.

    Construction is scheduled from Dec’09 to Aug’11, with the conversion to residential units.

  • DESIGN TEAM, CLIENT & VALUE

     

    Client: Olympic Delivery Authority

    Project Manager: Lend Lease

    Architect 1: Lifschutz Davidson Sandilands

    Architect 2 : Haworth Tompkins

    Civil Engineer: URS Corporation ltd

    M&E Engineer 1: Lend Lease

    M&E Engineer 2: RN Murphy & Associates Quantity Surveyor: Gardiner & Theobald

     

     

  • DOWNLOAD PROJECT PDF

HEAD OFFICE

Elliott Group,

Ballyhaise Road,

Latt,

Cavan

Co.Cavan,

H12 H155

GET IN TOUCH

DUBLIN OFFICE

Elliott Group,

27 St James' Walk,

Herberton

Rialto

Dublin 8

D08 VP95

UK OFFICE

Elliott Group,

225 Q West,

Great West Road,

Brentford,

London,

TW8 OGP

Website by Copper Tree

©2016 Elliott Group. All rights reserved.

  • PROJECT DETAILS   

     

    The Athletes Village is a Lendlease Developments Ltd. project for the 2012 Olympic Games. It includes the Design and Construction of Rail Infrastructure, Roads, Utilities, 2,700 new homes of various sizes and tenures, public realm, landscaping, all-age Academy School, a hotel, retail units, and ancillary works.

    The Elliott Group were appointed as preferred bidder in November 2009 for the Design & Build of Plot N14 — Athletes’ accommodation. The scheme comprises 201 residential units accom- modating 1,500 athletes during the games. This scheme will be re-configured post-2012 (to ‘legacy mode’) and the Athletes Village will form part of a wider regeneration of the area. The units will be a mix of market, intermediate, and social tenures. Plot N14 consists of four blocks in a U-shape around a central courtyard, ranging from 8 to 11 storeys, with parking for 99 cars, 20 motorbikes, and 201 bicycles. Construction is re-inforced concrete frame with pre- cast facades and recessed glazing.

    Construction is scheduled from Dec’09 to Aug’11, with the conversion to residential units.

  • DESIGN TEAM, CLIENT & VALUE

     

    Client: Olympic Delivery Authority
    Project Manager: Lend Lease

    Architect 1: Lifschutz Davidson Sandilands

    Architect 2 : Haworth Tompkins

    Civil Engineer: URS Corporation ltd

    M&E Engineer 1: Lend Lease

    M&E Engineer 2: RN Murphy & Associates Quantity Surveyor: Gardiner & Theobald

     

     

  • DOWNLOAD PROJECT PDF

HEAD OFFICE

Elliott Group,

Ballyhaise Road,

Latt,

Cavan

Co.Cavan,

H12 H155

DUBLIN OFFICE

Elliott Group,

27 St James' Walk,

Herberton

Rialto

Dublin 8

D08 VP95

UK OFFICE

Elliott Group,

225 Q West,

Great West Road,

Brentford,

London,

TW8 OGP

GET IN TOUCH

HEAD OFFICE

Elliott Group,

Ballyhaise Road,

Latt,

Cavan

Co.Cavan,

H12 H155

DUBLIN OFFICE

Elliott Group,

27 St James' Walk,

Herberton

Rialto

Dublin 8

D08 VP95

UK OFFICE

Elliott Group,

225 Q West,

Great West Road,

Brentford,

London,

TW8 OGP

Website by Copper Tree

©2016 Elliott Group. All rights reserved.